Excavating Parking Spaces

They are excavating the land I purchased on the upper road above the villa, which will be for the parking spaces. It was very hard work even with the large diggers we were using.


E8E8CD37-6A70-46A1-BBFE-3CE4420D3E1F_1_105_c

Pool Walls Finished

2745B879-2DBF-43E0-8CFD-4D1B383BECAA_1_105_c

External Walls Completed

Building work must stop now from June to September.

The builders will have to find alternative work over the summer in their own country Albania and we may have to wait a while for them to be available again, once they are allowed to start work after the summer break.

984EEDD4-03DE-4FAE-BD73-FFC399900D44_1_201_a

First-Floor Walls Get Taller

BCAEC961-E8C6-419F-9D33-4D7C7BCDC2AC_1_105_c
F00A4266-E5C7-4135-8343-7EEB19705B11_1_105_c

First-Floor Walls Started

30708C63-3407-44CC-85FC-606BFE158507_1_105_c
B4C74149-16A7-429E-B6F4-3A56CEFB82C6_1_105_c

First-Floor Floor Slabs Laid

E3401928-7243-4105-81AA-02D046414364_1_201_a

Ground-Floor Walls Go Up


FE663835-FEF2-418A-84D3-EAB02C992D29_1_105_c
07DE0BF9-9D27-4B40-93AC-A3C784EBA0DB_1_201_a

Pool Walls Started


C63EB35E-84E2-4A5A-B848-A7F55D1DE3B6_1_201_a
865F0549-FF0B-4F28-B8A0-0311F2799013_1_201_a

Excavating For The Pool

The project had to be put of hold because of incorrect purchase registration details and various planning problems, which had to be sorted out.

Good news is that we started again today, which is extremely exciting.

All the excavation work needs to be done first before they start building the villa and they are now digging out the pool.


pooltwo
6A01E600-51B9-4DD0-AC9F-FB2AB58C7492_1_201_a