Metal Support Beams

The metal support beams have been installed to support the conservatory (also known as a winter garden in Montenegro), which will serve as the connection between the two buildings.

4CD5FB49-265E-409D-A38C-9E95135CBE36_1_105_c

Outside Kitchen & Terrace

The roofs of the outside kitchen and terrace area have both been completed and look very attractive.


70AE7B86-E4D7-4801-953A-166DF77C3CA4_1_105_c

0E7E3BB4-C7BF-43E1-9268-9A4AC328CF47_1_201_a

BFB3E7E3-5F66-4B76-A2E0-5FA134A92764_1_105_c

New Roof Put On Terrace

1AE0D9BA-DD1F-4E01-8E42-523F4171DE4C_1_105_c

Outside Kitchen Roof Tiles

C697F1CE-4034-48CD-B9C3-F83A00F1A3B2_1_105_c

Outside Kitchen Taking Shape

1B83FF2A-FC9F-4348-9972-3A3755BE89C0_1_105_c
9179F39C-4931-40D7-B167-AA8DF2B22DF8_1_105_c

Vlado, Stefan & I in a Meeting

Vlado is informing me that the original roof of the terrace must now be entirely rebuilt because the timber originally used is no longer structurally sound.


1ABB4FF2-E1EC-4D30-BD00-8931ED5105D8_1_201_a

Terrace Paving & Sitting Area

The sitting area is now finished, and I will be having large cushions made for seating and back support. I've designed the area to be spacious enough for someone to sleep on it.

2645E5DC-56CE-4630-978F-5A0A62B84320_1_201_a

Barbecue Chimney Being Built

609E842D-AA9F-4F56-90B2-141777071CBB_1_201_a

Outside Kitchen Paving

AEC632F3-71EA-47D2-BEC0-96D72BC66A39

Reconstruction Of Terrace

We are now in the process of dismantling the terrace in preparation for its reconstruction.

The stonemasons will rebuild it to ensure it is structurally much stronger, capable of supporting the large stone sitting area I've designed.


9B722BC9-9A36-4363-A358-01F1D44C2ED9_1_105_c

Building Outside Kitchen

4AEEBB69-F546-4233-A985-924205F5ADD2

Lovely Garage Rafters

340C58CE-21F2-429A-B3F6-30407984E1F1_1_105_c

Garage Looking Really good

This large double garage and wall have been beautifully constructed using stone excavated from the ground beneath the site.

They sit naturally within the landscape, as if it has always been there, which is exactly what I envisioned when designing them.

To put their scale into perspective: the wall is 33.5 meters long with a maximum height of 4.6 meters, while the garage and storage room are 10 meters wide and 4.2 meters high.


5622915A-3F15-4E4C-9422-D5EB6117F5CB_1_105_c
51B1F789-A18A-4BC0-8BA6-C91B2D13DDB4_1_105_c 92027B15-16CB-4790-9F68-CD09B311F964_1_105_c

Olive Trees Growing Back

EB002113-FBB7-4E8E-8C1D-17B4B6881A83_1_105_c

The Villa Looks Great

51206C67-E350-4FCB-B223-5847E09E73D1_1_105_c
6B8A2582-3A99-463C-980A-661D8B617062_1_201_a
FE2D0637-93D8-4D04-8514-0BE14D0BC45A_1_201_a
19832629-4318-4B31-A0F1-FDED430DF153_1_201_a

Construction Of Garage Roof

Over the past three days, the timber for the finished ceiling of the garage has been fitted onto the joists. Next comes the instruction of the roof membrane, followed by the insulation.

All that remains now is the lay the roof tiles and install the Velux window above the storage room.


8E2FAE80-3CDF-4420-9714-72ABFCF04126_1_105_c
C054FF14-3AAE-4B06-B1CC-8A68E44943BE_1_105_c
99E1851A-CAEF-4999-93DC-7D6B81A8E81E_1_105_c

Paving Large Terrace

7D9BA506-1FF4-43A9-8CD4-42C624821025_1_105_c

Garage Roof Started

16D62850-39E3-42AF-ACB6-F31839FC9053_1_105_c
9AC46D96-5D72-445D-BE8A-4130FA9878CE_1_105_c

Garage Walls Completed

All the stone walls of this garage have now been fully completed. The finished garage now measures 9.9 meters long x 6.5 meters wide and 4.6 meters high at the back wall.

2FBA755F-FA8F-4615-9783-DD1BB3C46EFF_1_105_c

Planting The Olive Trees

16752B6C-425F-407D-BD2F-2E8A0AAB820A_1_102_a 7529A913-64E3-4F69-8102-340C8B79E4E8_1_102_a
304CB376-8E6F-4360-93A8-BF0D534E5C4D BAE1BA5F-6D69-4BB3-A2D8-4C0451C3D023_1_201_a

Pruning Olive Trees

Bojan, an expert in olive trees, is performing hard pruning on the four olive trees, prepare them for uprooting and transportation from Ulcinj, near the Albanian border, to my villa on Luštica, approximately 108 km away.


D4BA0719-AF6A-43A3-B746-58042A400185_1_105_c

Continuing to build garage

84AA10D7-043C-4478-BA35-BD06BB18A3D7_1_105_c

Starting to Build the Garage

ED9D5653-FAEF-499D-8A48-F0B6A4D8768C

Stefan & Vlado Celebrating

Stefan and Vlado are celebrating their official return to work now that all COVID-19 restrictions have been lifted.

This team of builders managed to continue working quite a bit during the pandemic in Montenegro, which wasn't the case in the UK.