Lowest Floor Stonework

6EEB8753-DEB8-4296-BE0E-FC8B596C5E0A

Windows in Original Villa

DD8A111D-FC8F-4F28-9D6E-D63DC2ABA0EB_1_105_c

Both Roofs Are Finished

342DB950-D8BA-4576-B29E-CF76F3E15A34_1_105_c

Original Villa Roof Started

1CA8EF2B-EE31-4867-866B-990D5D140EC3

Original Villa Walls Built

B11132A1-4511-4261-8AE5-AC20EA5AFF16_1_105_c

Original Villa New Roof

We are taking the roof off the original villa because it needs to be replaced as it was not structurally sound. This will enable us to build the walls up a bit higher so the four new larger windows on this top floor with be in their correct positions.

There are three other benefits of doing this major construction work, firstly this original villa will be at the correct height to be able to join the newly rebuilt villa, secondly the ceilings will be higher and thirdly the rafters will be able to be exposed.

0BA9E3BF-F225-47A0-ADB4-72627C55548D_1_105_c

Windows Being Changed

The windows in the original villa are having real stone put around them and are being made the same larger size as the windows in the newly built villa.

On the lowest floor we have also made two, rather than the original one window there was on this floor.


DF58B96E-DE49-439D-BD0C-649E5705C118_1_105_c

Picking Four Olive Trees

While I was in London Stefan with the help of Nikola, a gardener and plant supplier from Bar, had found me some olive trees that were planted in an olive grove near the Albania border.

They took some photos of all the olive trees available and with the help of Nikola telling me which were there healthiest I chose these four trees.

How fantastically useful WhatsApp has been throughout this project, enabling me to remotely be there when I am in another country.

DFE37390-A736-42D4-B49F-35DB8B157971_1_201_a F24F44A3-EDEC-455D-8919-72E71A78B618_1_201_a
4AF6C60A-E76C-4837-8105-B71862EDA6A1_1_201_a 556B41B5-06C9-4442-9ECD-AF79B23652D8_1_201_a

Parking Space Walls

The huge parking space wall, which is 33.5m long and 7.5m high at its tallest part, is going amazingly well and looks really beautiful. I am very happy with how everything is going.


FFF00F46-A605-4737-BDB5-BDEE8FF3D659_1_201_a
81D679DC-FD21-483B-9A09-C9A467ECA543

The three Amigos

Vlado, Stefan and I chatting about what we were going to do next.


E7CAA0A9-4673-4F22-AA8F-6C47400ACEB0_1_105_c

Vlado, Stefan, Rok & I

Vlado, Rok, Stefan and I above the house on the top road, talking about the huge wall I have asked them to build for the parking space and garage.


BC391D4D-0808-4F70-B732-3AB8748CBB8A_1_201_a