Parking Spaces Wall started

2065EEB9-DFA5-4FBD-9D93-0106E320309E_1_105_c

Outdoor Kitchen Started

Vlado and Rok were discussing the outdoor kitchen while Rok and the team were concreting the floor in preparation for the paving.


911E820F-0135-4C51-95AB-4E2835590910_1_105_c

View Of Top Entrance

2F085A8F-0259-4A1B-8F8B-709FB6C5CD37_1_105_c

Paving Being Done

AD766EFA-263D-4ACF-BE09-D28473EACC18

Right-Side Steps

I had created architectural drawings to show exactly how I wanted the steps to be, and Vlado, knowing that when it rains in Montenegro it really pours, had to determine where the drainage system for these steps should be installed.


336E81D7-36C6-4D5B-AA4C-AC56DC88D9F8_1_201_a

Vlado Being Thoughtful

A9A5750A-0F2A-4D19-8B51-6726F8BCA7E4_1_105_c

Lower-Road Steps Finished

DC36A436-FD0C-4D09-BC25-7554F7DC13C6

Milovici Roof Finished

B30D53F0-D37B-4601-B2DA-F71580B32748_1_201_a

Windows & Doors Fitted

The windows and doors have been fitted into the newly built part of the villa, and the look lovely.


D26D19A3-1865-4038-BD1A-AE7C00D69E3F_1_105_c

View From Top Wall & Road

491A49C2-B43B-4A86-AC5C-4430F4262A2D_1_105_c

Top-Wall, Steps & Gate finished

3486EDFD-39BB-4025-9CD0-2C3B7A0C9B90_1_201_a

Milovici Roof Started

While we had the roofers on site, we moved them to Milovići to begin work on the roof there whenever they were unable to continue their work at Zabrdje because of other construction work taking place around them.
D1D8B022-64BB-4C31-BE4B-9538A76B1DB2_1_201_aE41A28AC-6051-4D63-AA47-B01C81967108_1_201_a

Top Gate Being Built

C0B2296B-5EEF-4F8E-8B54-68922F3EAF28
7BA0CE6F-9EAF-4760-8C1C-957975ED944D

Roof Tiles Are On

783CC0B2-F5AD-4EFD-8271-2E5A379031D2_1_105_c

Left-Side Steps

These are the steps on the left side that go down through the different levels of the garden.

They are nearly complete, and I'm really happy with their lovely appearance, and they look exactly as I had envisioned.


C4BB3288-B23E-4E43-BE7D-B30363D2D73D_1_105_c

More Excavation Work

I always knew that more excavation work would be needed in this parking area, as we required additional stone for the villa and the walls. It really is like having our own mini quarry.


7A044591-D51A-45B4-BC80-7DD5F820A87F_1_105_c

Roof Going On

B0924458-0D8D-44E1-8E35-512503E051C5
406117A2-0B5D-41A1-A25F-8184678F5DEB